← i3 leaderboard

KANCHAT, SALINTHIP

Race i3 · Bib 3571 · Female · iTRA PI 318
Status
Finished
Total time 17h04m27s
Finished at Sun 09 Aug 00:49:27
Effort today
Current Performance Index: 363
iTRA PI 318 · running 14% above career level — PB pace
Aid station schedule
START · 0.0 km ✓
out07:45:00
HQ_IN_1 · 10.0 km · Current PI 318 ✓
Section time 3h02m43s
Section 10.0 km · +1116 / −123 m
expected at10:54 cut-off at10:50
in10:47:43out11:16:03
6 min FASTER than expected
Dwell 28 minutes.
Section PI 372 — going harder than career
W1 · 19.9 km · Current PI 356 ✓
Section time 2h01m02s
Section 9.9 km · +624 / −684 m
expected at13:31 cut-off at13:30
in13:17:05
14 min FASTER than expected
Section PI 458 — way above career, blow-up risk
A2_IN · 26.9 km · Current PI 416 ✓
Section time 1h35m37s
Section 7.0 km · +302 / −511 m
expected at14:55 cut-off at15:20
in14:52:42out15:13:34
2 min FASTER than expected
Dwell 21 minutes.
Section PI 370 — going harder than career
W2_IN · 37.8 km · Current PI 354 ✓
Section time 2h44m32s
Section 10.9 km · +720 / −509 m
expected at17:59 cut-off at18:40
in17:58:06out18:28:30
1 min FASTER than expected
Dwell 30 minutes.
Section PI 371 — going harder than career
HQ_IN_2 · 49.4 km · Current PI 355 ✓
Section time 3h07m49s
Section 11.6 km · +762 / −704 m
expected at21:52 cut-off at22:05
in21:36:19out21:58:53
15 min FASTER than expected
Dwell 23 minutes.
Section PI 348 — at career level
FINISH · 61.1 km · Current PI 339 ✓
Section time 2h50m34s
Section 11.7 km · +147 / −1139 m
expected at01:24 cut-off at00:30
in00:49:27
35 min FASTER than expected
Section PI 293 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.