← i3 leaderboard

HUTAWANICH, SRIYAPHA

Race i3 · Bib 3670 · Female · (no iTRA PI)
Status
Finished
Total time 16h29m11s
Finished at Sun 09 Aug 00:14:11
Effort today
Current Performance Index: 375
(no iTRA PI) · Current PI: 375
Aid station schedule
START · 0.0 km ✓
out07:45:00
HQ_IN_1 · 10.0 km ✓
Section time 2h47m43s
Section 10.0 km · +1116 / −123 m
cut-off at10:50
in10:32:43out10:48:22
Dwell 16 minutes.
Section PI 405
W1 · 19.9 km · Current PI 405 ✓
Section time 1h53m14s
Section 9.9 km · +624 / −684 m
expected at12:52 cut-off at13:30
in12:41:36
10 min FASTER than expected
Section PI 490
A2_IN · 26.9 km · Current PI 490 ✓
Section time 1h38m28s
Section 7.0 km · +302 / −511 m
expected at14:12 cut-off at15:20
in14:20:04out14:46:00
7 min SLOWER than expected
Dwell 26 minutes.
Section PI 359
W2_IN · 37.8 km · Current PI 359 ✓
Section time 2h29m56s
Section 10.9 km · +720 / −509 m
expected at17:24 cut-off at18:40
in17:15:56out17:39:47
8 min FASTER than expected
Dwell 24 minutes.
Section PI 407
HQ_IN_2 · 49.4 km · Current PI 407 ✓
Section time 2h56m12s
Section 11.6 km · +762 / −704 m
expected at20:50 cut-off at22:05
in20:35:59out21:06:47
14 min FASTER than expected
Dwell 31 minutes.
Section PI 371
FINISH · 61.1 km · Current PI 371 ✓
Section time 3h07m24s
Section 11.7 km · +147 / −1139 m
expected at00:19 cut-off at00:30
in00:14:11
5 min FASTER than expected
Section PI 266
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.